Bulletin of Surveying and Mapping ›› 2023, Vol. 0 ›› Issue (11): 158-162.doi: 10.13474/j.cnki.11-2246.2023.0345

Previous Articles     Next Articles

High-precision 3D real scene construction method and practice for natural resources survey and monitoring system in Inner Mongolia Autonomous Region

LI Dezhong1, YAO Na2, XUE Yongjun3, XIONG Wenhao3, WANG Longxiu3   

  1. 1. Department of Natural Resources of Inner Mongolia Autonomous Region, Hohhot 010020, China;
    2. Beijing Feima Hangyao Technology Co., Ltd., Beijing 100192, China;
    3. Surveying and Mapping Geographic Information Center of Inner Mongolia Autonomous Region, Hohhot 010000, China
  • Received:2023-08-21 Online:2023-11-25 Published:2023-12-07

Abstract: The establishment of a natural resource survey and monitoring system requires a unified 3D spatial positioning framework and data analysis foundation. This paper takes into account the topographic features, regional economic pattern, and high-quality land and space system goals of Inner Mongolia Autonomous Region, and studies the overall layout and construction method of building a high-precision 3D real scene natural resource survey and monitoring data base by layering, grading, and different precisions, focusing on the technical route, technical indicators and practical results of the 3D real scene construction of the terrain level and city level. The accuracy of the relevant practical results is better than the designed technical indicators. The results have effectively served Inner Mongolia's natural resource management, urban land space monitoring, 3D spatio-temporal database construction and other purposes, and promoted the construction process of 3D real scene Inner Mongolia.

Key words: natural resource survey and monitoring, 3D real scene, grading, precision, construction method

CLC Number: