测绘通报 ›› 2026, Vol. 0 ›› Issue (1): 182-186.doi: 10.13474/j.cnki.11-2246.2026.0130

• 测绘地理信息技术应用案例 • 上一篇    

“4M1E”质量控制模型在大型测绘工程场景的应用

曹起铜1, 温宇斌2, 黄国栋1, 李兆丰1, 沈宇臻1,3   

  1. 1. 浙江省测绘科学技术研究院, 浙江 杭州 310012;
    2. 长三角(嘉兴)城乡建设设计集团有限公司, 浙江 嘉兴 314050;
    3. 同济大学测绘与地理信息学院, 上海 200092
  • 收稿日期:2025-08-14 发布日期:2026-02-03
  • 通讯作者: 沈宇臻。E-mail:yuzhenshen@tongji.edu.cn
  • 作者简介:曹起铜(1975—),男,硕士,高级工程师,主要研究方向为工程测量、测绘地理信息质量控制。E-mail:402397910@qq.com

Application of the “4M1E” quality control model in large-scale surveying and mapping projects:a case study of the 3D reality modeling project in Jiaxing city

CAO Qitong1, WEN Yubin2, HUANG Guodong1, LI Zhaofeng1, SHEN Yuzhen1,3   

  1. 1. Zhejiang Academy of Surveying and Mapping, Hangzhou 310012, China;
    2. Yangtze River Delta (Jiaxing) Urban-Rural Construction Design Group Co., Ltd., Jiaxing 314050, China;
    3. College of Surveying and Geo-Informatics, Tongji University, Shanghai 200092, China
  • Received:2025-08-14 Published:2026-02-03

摘要: 随着数字中国与数字经济建设的持续推进,大型测绘工程项目剧增,传统的“两级检查、一级验收”已难以满足现代大型测绘工程项目高质量发展的需求。本文以嘉兴市实景三维工程建设项目为例,引入在制造业及其他领域广泛应用的“4M1E”质量控制模型,通过对人员、材料、机械、方法及环境因素在测绘场景中实施关系重构,实现对大型测绘工程项目的全过程、全要素质量管理。结果显示,案例项目中地形级地理场景数据、三维模型数据和实体数据的成果优良率均达98%以上,阶段性工作任务皆按时完成,且有效降低了项目总成本;可见通过关系重构后的“4M1E”模型可满足现代大型测绘工程场景中的质量管理,有效提高了项目运行效率和质量。

关键词: 4M1E, 质量控制, 大型测绘工程项目

Abstract: With the continuous development of digital china and the digital economy,the number of large-scale surveying and mapping projects has increased significantly.The traditional “two-level inspection and one-level acceptance” approach is no longer sufficient to meet the high-quality development requirements of modern large-scale surveying projects.This paper takes the Jiaxing city 3D engineering construction project as a case study and introduces the “4M1E” quality control model,which is widely used in manufacturing and other fields.By restructuring the relationships between the man,material,machine,method,and environment within the surveying context,this approach enables comprehensive quality management throughout the entire process and all elements of large-scale surveying projects.The results indicate that in this project,the quality pass rates of terrain-level geographic scene data,3D model data,and land-use entity data all exceeded 98%,with all phase tasks completed on schedule,effectively reducing the overall project cost.The study demonstrates that the restructured “4M1E” model can meet the quality management needs of modern large-scale surveying projects,effectively improving project efficiency and quality.

Key words: 4M1E, quality control, large-scale surveying and mapping projects