测绘通报 ›› 2019, Vol. 0 ›› Issue (2): 121-124,140.doi: 10.13474/j.cnki.11-2246.2019.0057

Previous Articles     Next Articles

Design and implementation of quality inspection system for urban underground integrated pipeline

LI Yunjian1, LI Chong2, SHE Dongjing2, YANG Jianyi2   

  1. 1. Guangxi Quality Inspection Station of Surveying, Mapping and Geoinfomation Products, Nanning 530023, China;
    2. Sichuan Quality Supervision and Testing Center of Surveying and Mapping Product, Chengdu 610041, China
  • Received:2018-11-06 Revised:2018-11-19 Online:2019-02-25 Published:2019-03-05

Abstract:

According to the survey data of city underground pipeline and content, high quality requirements, the traditional examination method is difficult to meet the accurate and efficient to carry out quality inspection, this paper analyzes the characteristics of comprehensive underground pipeline data, discusses the contents and methods of the quality inspection results, puts forward a scheme of integration within and outside the industry underground pipeline quality inspection the system is composed of plate based on the rapid inspection subsystem and the operators within the industry clusters based on the automatic quality inspection subsystem, the database management mode, the two subsystems can be seamlessly connected to. The application example shows that the system can effectively improve the information degree of quality inspection, improve the efficiency of quality inspection, and ensure the accuracy and reliability of the inspection results.

Key words: underground pipelines, quality inspection system, construction scheme, informatization

CLC Number: