测绘通报 ›› 2026, Vol. 0 ›› Issue (5): 22-26,31.doi: 10.13474/j.cnki.11-2246.2026.0505

• 第二十八届中国科协年会学术论文 • 上一篇    

无人机倾斜摄影测量技术支持下的三维建模可行性研究

韩婷婷1, 李晓强1, 范宪创2,3, 欧阳亚丽4   

  1. 1. 中水北方勘测设计研究有限责任公司, 天津 300222;
    2. 华北理工大学人工智能学院, 河北 唐山 063210;
    3. 河北省工业智能感知重点实验室, 河北 唐山 063210;
    4. 北京景山学校曹妃甸分校, 河北 唐山 063209
  • 收稿日期:2026-04-14 发布日期:2026-06-09
  • 作者简介:韩婷婷(1990—),女,硕士,工程师,研究方向为摄影测量与遥感应用。E-mail:1172055039@qq.com

Feasibility study of 3D modeling based on UAV oblique photogrammetry

HAN Tingting1, LI Xiaoqiang1, FAN Xianchuang2,3, OUYANG Yali4   

  1. 1. China Water Resources Beifang Investigation, Design & Research Co., Ltd., Tianjin 300222, China;
    2. College of Artificial Intelligence, North China University of Science and Technology, Tangshan 063210, China;
    3. Hebei Key Laboratory of Industrial Intelligent Perce, Tangshan 063210, China;
    4. Beijing Jingshan School Caofeidian Branch, Tangshan 063209, China
  • Received:2026-04-14 Published:2026-06-09

摘要: [目的]本文旨在解决水利枢纽复杂地形实景三维建模精度不足、效率偏低的问题,推动倾斜摄影测量技术在智慧水利建设中的深度应用。[方法]以黄河万家寨水利枢纽为对象,采用大疆M300无人机全域倾斜摄影P1相机在重点区域贴近摄影补拍,获取地面分辨率2 cm的多视角影像,基于DP Modeler软件构建“全域检查—分类精修—单体化建模—模型融合”精细化流程,完成模型缺陷处理并构建测绘级精度实景三维模型。[结果]建模结果显示,模型纹理真实、几何完整,可精准捕捉水工建筑物结构形变,平面与高程精度满足水利工程测绘要求,作业耗时缩短60%、建模成本降低 30%以上。[结论]研究表明,无人机倾斜摄影三维建模可有效解决复杂峡谷地形水利枢纽高精度建模难题,为水利工程数字化监管、水电站智能化建设及水利基础设施智慧化升级提供技术支撑与实践参考。

关键词: 无人机航测, 倾斜摄影测量, 水利枢纽, 三维建模, 测绘级精度

Abstract: [Purposes] To solve the problems of insufficient accuracy and low efficiency in real-scene 3D modeling of complex terrain at water control projects,and to promote the in-depth application of oblique photogrammetry in smart water conservancy construction.[Methods] Taking the Wanjiazhai Water Control Project on the Yellow River as the research object,DJI M300 UAV is used for full-area oblique photography and P1 camera for close-range supplementary photography in key areas to obtain multi-view images with 2 cm ground resolution.Based on DP Modeler software,a refined workflow of “full-area inspection-classification and refinement-monolithic modeling-model fusion” is established to eliminate model defects and construct a surveying and mapping-grade real-scene 3D model.[Findings] The modeling results show that the model has realistic texture and complete geometry,and can accurately capture structural deformation of hydraulic structures.Both horizontal and vertical accuracy meet the requirements of water conservancy engineering surveying and mapping.The operation time is shortened by 60% and modeling cost reduced by more than 30%.[Conclusions] The study indicates that UAV oblique photogrammetry for 3D modeling can effectively solve the problem of high-precision modeling of water control projects in complex canyon terrain,providing technical support and practical reference for digital supervision of water conservancy projects,intelligent construction of hydropower stations,and intelligent upgrading of water conservancy infrastructure.

Key words: UAV aerial survey, oblique photogrammetry, water control hub, model refinement, survey-grade precision