Analysis on the construction of surveying and mapping big data center under structural reform on supply side: a case of geospatial big data center in Shaanxi province

YANG Hongshan1, BAI Mu2, LI Junfeng1   

  1. 1. Shaanxi Administration of Surveying and Mapping and Geoinformation, Xi'an 710054, China;
    2. Shaanxi Basic Geographic Information Center of Ministry of Natural Resources, Xi'an 710054, China
  • Received:2021-01-28 Revised:2021-11-30 Published:2022-02-22

Abstract: Under the requirements of high-quality development, there are several supply-side problems, such as decentralized IT infrastructure, "isolated" data resources and production capacity bottlenecks. The geospatial big data center in Shaanxi promotes the supply side structural reform of surveying and mapping through three stages of work. Firstly, IT infrastructure construction and upgrading realizes intensive utilization and flexible allocation. Then, data resource transformation and sharing makes sure big data analysis and open interconnection. Thirdly, industrial chain upgrading and efficient supply aims to on-demand renewal and service. The utilization rate of hardware resources of the big data center is close to 99%. The big data center has played an important role in improving quality and efficiency in geography national condition monitor, national GNSS reference station network adjustment, the third national land resource survey, etc.

Key words: surveying and mapping, new infrastructure, big data center, structural reform on supply side, high quality development