测绘通报 ›› 2017, Vol. 0 ›› Issue (6): 108-113.doi: 10.13474/j.cnki.11-2246.2017.0201

• 技术交流 • 上一篇    下一篇

测量标志动态管理信息系统的设计与实现

何宗友, 朱紫阳, 龚根生, 袁锡豪   

  1. 广东省国土资源测绘院, 广东 广州 510500
  • 收稿日期:2016-12-13 出版日期:2017-06-25 发布日期:2017-07-03
  • 作者简介:何宗友(1976-),男,高级工程师,主要从事测绘技术研究和成果质量检查工作。E-mail:9322127@qq.com
  • 基金资助:
    广东省国土资源科技专项(GDGTKJ2016001);广东省2013年度基础测绘计划

Design and Realization of Surveying Markers Dynamic Management Information System

HE Zongyou, ZHU Ziyang, GONG Gensheng, YUAN Xihao   

  1. Surveying and Mapping Institute Lands and Resource Department of Guandong Province, Guangzhou 510500, China
  • Received:2016-12-13 Online:2017-06-25 Published:2017-07-03

摘要: 测量标志管理是一项系统性、持续性的工作,当前的管理系统往往缺乏对测量标志整个生命周期的跟踪反馈,难以形成有效的监管,技术手段急需改善和提升。本文立足当前测绘信息化发展的现状,对测量标志动态管理需求进行了全面的分析,从系统的逻辑架构、网络架构、数据组织、平台结构及安全性控制等方面阐述了测量标志动态管理信息系统的设计与实现,并结合数字城市、天地图·广东、广东省国土资源在线巡查系统,以及实际业务需求,开发完成了一个具有合理负载且维护方便的广东省测量标志管理信息系统。结果表明,该系统改变了测量标志传统管理模式,满足标志点巡查、更新、动态管理的需要,提高了测量标志的监管水平,对维护测量标志生命周期的各个环节都具有现实和科学意义。

关键词: 测量标志, WebGIS, 动态管理, 生命周期, 信息化

Abstract: The survey markers management is a systematic and continuous work. The current management system lacks tracking feedback on the whole life cycle of the measurement marks. It is difficult to form an effective supervision. It is urgently needed to improve and enhance the technical means. In this paper, dynamic management of demand survey marks were comprehensively analyzed based on the current situation of the development of surveying and mapping information. The design and implementation of a dynamic management information system of the survey marks is described from the logic of the system architecture, network architecture, data organization, platform structure and security control. Combining with the digital city, Map World Guangdong, Guangdong provincial online inspection system, and the actual business needs, a reasonable load, maintenance of Guangdong Province survey mark management information system convenient is developed. The results show that the system has changed the traditional management mode of measuring marks. It meets the requirements of inspection, updating and dynamic management of the markers,and improves the monitoring level of measurement marks, and has a realistic and scientific significance to maintain the life cycle of the measurement of each link.

Key words: survey markers, WebGIS, dynamic management, life cycle, informatization

中图分类号: