测绘通报 ›› 2018, Vol. 0 ›› Issue (12): 133-137.doi: 10.13474/j.cnki.11-2246.2018.0399

Previous Articles     Next Articles

Construction of Submitting Regulatory Detailed Planning for Approval System Based on Business and Spatial Monitoring in Parallel—Taking Nanjing as an Example

DOU Wei1, HUANG Zhizhou2, CUI Bei1   

  1. 1. Nanjing Urban Planning and Research Center, Nanjing 210008, China;
    2. Beijing Guo Measurement Information Technology Co., Ltd., Beijing 100000, China
  • Received:2018-08-12 Online:2018-12-25 Published:2019-01-03

Abstract: This paper studies on a GIS data quality checking method base on workflow, presents an implement mentality of submitting regulatory detailed planning for approval system based on business and spatial monitoring in parallel and studies the system construction method taking Nanjing for instance. The paper resolves the problem of multi-process interleaving and the interleaving of OA and GIS. Checking of some technical specifications in the process is implemented base on spatial monitoring and GIS spatial analysis, which improves the efficiency and scientificity of the technical checking of regulatory detailed planning.

Key words: regulatory detailed planning, submitting for approval, GIS, e-government

CLC Number: